Material list for your unit
About 425 sq ft carpet area, 1 bathroom. Rough quantities to plan and compare rates; final quantities depend on your floor plan.
- Cement (OPC 53 / PPC) for internal plaster9 bags12 mm plaster 1:6, 0.6 bag per 100 sq ft
- Plaster sand64 cft4.3 cft per 100 sq ft
- Floor tiles / vitrified468 sq ftcarpet area + 10% wastage
- Wall tiles (bathroom + kitchen dado)243 sq ft1 bathroom(s) + kitchen, +10%
- Tile adhesive15 bags (20 kg)about 50 sq ft per bag
- Wall putty106 kg2 coats, about 12 sq ft per kg
- Primer13 L1 coat, about 100 sq ft per litre
- Interior emulsion paint22 L2 coats, about 120 sq ft per litre per coat
- Electrical points (wiring, switches, boxes)19 pointslights, fans, sockets, geyser
- House wire 1.5 / 2.5 / 4 sq mm3 coils (90 m)about 8 points per coil, mixed sizes
- CPVC / UPVC pipes and fittings1 bathroom set(s) + 1 kitchensized from your plan
- Sanitary ware (WC, basin, taps, shower)1 set(s)plus kitchen sink and tap
- Doors (main + bathroom)2 door(s)frames, shutters, hardware
- Windows / ventilatorsas per planshare the floor plan for sizes
Materials only, delivered with a GST invoice. Fitting work is not included; ask us for local contractor contacts.
Buy in the order the work happens
- 1Plaster: cement and plaster sand
- 2Plumbing and wiring (inside walls): pipes, fittings, conduits, wire
- 3Flooring and wall tiles: tiles, adhesive, grout
- 4Doors and windows: frames, shutters, hardware
- 5Putty and paint: putty, primer, emulsion
- 6Fittings: sanitary ware, switches, lights
Plaster and tiles need sand, cement and aggregate too: see sand and cement.
Common questions
What is a bare-shell flat or studio?
The builder hands over only the RCC frame and brick walls. Plaster, flooring, tiles, doors, windows, plumbing, wiring and paint are the buyer's job. Your sale agreement lists exactly what is and is not included.
Do you do the fitting work too?
We supply the materials, delivered to your site with a GST invoice. We do not employ fitting labour; on request we share contacts of local contractors, and you deal with them directly.
How accurate is the calculator?
It uses standard thumb rules, so treat it as a planning list. Share your floor plan and we confirm exact quantities before you buy.
Can I buy in stages?
Yes. Most buyers start with plaster cement and sand, then tiles and plumbing, then paint and electrical fittings. We hold the rate for each stage once confirmed.
Send your floor plan
We confirm exact quantities and quote the full list, usually the same working day.